MapServer 6.2 Release Plan
- RFC 70 : TinyOWS integration
- RFC 71 : MapCache integration
- RFC 73 : SVG symbology support
- RFC 75 : INSPIRE view services
- RFC 76 : XMP Metadata support
- RFC 77 : Multiple labels or collision-detected symbols per feature
- RFC 78 : Vector Field rendering
- RFC 79 : Layer Masks
- RFC 80 : Multiple font fallback support
- RFC 81 : Offset labels with leader lines
- RFC 84 : Code and issues migrated to github
- GD support disabled by default. Enable with --with-gd
- labelcache: speedups and reduced memory usage
- postgis input: reduced memory usage
- proj: use the unlocked thread free if proj >= 4.8.0
- optional fastpath 4326->3857 reprojections
- libtool builds: make install is now required. the mapserv and shp2img tools now link to a shared libmapserver library
- php mapscript build:
- support for PHP 5.4.x
- python mapscript build: todo
- support for ELEVATION and DIM_* WMS dimensions
- precise symbol placement: ANCHORPOINT
- support for named group layer
- basic multi-language support in WMS
- ANNOTATION layers are deprecated. All their functionality can be obtained using LABEL level STYLES with "labelpnt" GEOMTRANSFORM. Current annotation layer functionality is kept for the time-being, but new features (layer masking, multiple labels per feature, label offsetting) will bail out if applied to an annotation layer.
- CLASS->OVERLAY* => moved to second STYLE
- CLASS->BACKGROUNDCOLOR, COLOR, MAXSIZE, MINSIZE, OUTLINECOLOR, SIZE, SYMBOL => moved to STYLE
- STYLE->SIZEITEM => SIZE [binding]
- SYMBOL TYPE SIMPLE
See also the HISTORY.TXT for this release: https://github.com/mapserver/mapserver/blob/branch-6-2/HISTORY.TXT
A 6.0 -> 6.2 migration guide is being worked on. For now it lives in the source tree but should become part of official documentation soon: https://github.com/mapserver/mapserver/blob/branch-6-2/MIGRATION_GUIDE.TXT
##Planned Dates
We will plan for 3 betas and 2 release candidates (RC) over a 6 week period after the feature freeze (1 beta/RC per week each Wednesday). This will lead us to a final release sometime around beginning of August 2012:
- branch-6-2 creation, 6.2.0-beta1 : Fri. June 29th, 2012
- 6.2.0-beta2 - Wed. Aug 1st
- 6.2.0-beta3 - Wed. Aug 8th
- 6.2.0-rc1 - Wed. Aug 15th
- 6.2.0-rc2 - Wed. Aug 22nd
- 6.2.0 (final) - Wed. Aug 29th
Release Manager (see http://mapserver.org/development/rfc/ms-rfc-34.html)
Thomas Bonfort
- The current master branch is currently the 6.1 development version that we plan to release as 6.2
- The stable branch for this release will be called "branch-6-2" (not created yet).
- Once branch-6-2 is released, all commits targeted for 6.2 must be pushed to branch-6-2 only. Merging these fixes to master can/will be done by merging branch-6-2 into master. All commits to master should only concern features targeted for 6.4.
- The betas will be tagged in SVN as "rel-6-2-0-beta1", "rel-6-2-0-beta2", ... and the release candidates as "rel-6-2-rc1", "rel-6-2-rc2", etc...
- Our practice of dealing with HISTORY.TXT needs to be updated in order to account for the more frequent merging practices that come with git usage.
- Once 6.2 has been branched, commits to the stable branches are not reflected into HISTORY.TXT. Instead of this, the commit message must be sufficiently explicit to be incorporated in the stable branch Changelog that will be more or less automatically generated on release day. A typical commit message in a release branch should follow the following best practices (c.f. http://tbaggery.com/2008/04/19/a-note-about-git-commit-messages.html ):
- Use a short single line summary as the first line
- include the ticket number in this first line
- if additional information needs to be added, write them in a paragraph, ideally wrapped at 72 chars, after skipping a blank line.
An example commit message could be:
Fix incorrect handling of foobar (#XXXX)
Optional detailed message as to why this was needed,
along with any information that might seem relevant.
This commit message will appear when annotating the
source code, so any caveats or tricky implications can
be mentioned here to.
In order to facilitate querying the Gihub issue database for tickets that still need to be addressed for this release, we try to stick to the following conventions:
- Tickets to be addressed for this release must have their target milestone set to "6.2 release"
- Bugs/Enhancements? that can't make it in this release but that we may want to address at a later time should be set to no milestone with a comment explaining that the bug is postponed and if possible a quick analysis
- The target milestone on a ticket should be set by the developers (bug owners) and not by the users (reporters).
Other good practices when dealing with tickets:
- Please file tickets for any non-trivial bugfix or change to the software. This is so that we keep a trace for future reference of all bugfixes and changes that were made (why and how).
- Please assign yourself to an issue as soon as you start working on it.
- Please include the bug number in the commit message, with the #xxxx notation. This will automatically link the commit to the ticket itself for future reference.
- Issues can be automatically closed from a commit message. Include a line with "closes #xxxx" in your commit message.
- Keep documentation in mind when fixing/changing things: if you cannot update the documentation yourself then please create a documentation bug describing the new feature/change and which document(s) should be updated.
The following query returns all currently open bugs that are tagged with the "6.2 release" target milestone: https://github.com/mapserver/mapserver/issues?milestone=31&state=open
You can further limit the issues assigned to you or targeting a specific component by clicking on the links to the left of the issue list
##QA TODO
##Open Tasks Update release procedure from svn->git