Skip to content

[Chore] Merge develop into sep-6 #1507

[Chore] Merge develop into sep-6

[Chore] Merge develop into sep-6 #1507

Re-run triggered November 1, 2023 17:42
Status Success
Total duration 20m 29s
Artifacts 1
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

wf_pull_request.yml

on: pull_request
Matrix: gradle_test_and_build / CodeQL Analysis
gradle_test_and_build  /  Gradle Test and Build
20m 5s
gradle_test_and_build / Gradle Test and Build
complete
0s
complete
Fit to window
Zoom out
Zoom in

Annotations

1 error and 2 warnings
gradle_test_and_build / Gradle Test and Build
HttpError: Resource not accessible by integration
gradle_test_and_build / CodeQL Analysis (java)
1 issue was detected with this workflow: Please specify an on.push hook to analyze and see code scanning alerts from the default branch on the Security tab.
gradle_test_and_build / CodeQL Analysis (python)
1 issue was detected with this workflow: Please specify an on.push hook to analyze and see code scanning alerts from the default branch on the Security tab.

Artifacts

Produced during runtime
Name Size
gradle-artifact Expired
20.2 MB