Skip to content

More reduced allocations #11238

More reduced allocations

More reduced allocations #11238

Triggered via pull request November 26, 2024 12:31
Status Cancelled
Total duration 3m 28s
Artifacts 2

pull-request.yaml

on: pull_request
Matrix: go-build
Matrix: go-test
Matrix: Go compat build/test
docker image smoke test
0s
docker image smoke test
Matrix: smoke-test-binaries
Fit to window
Zoom out
Zoom in

Annotations

24 errors
YAML Lint: test/cases/testdata/v1/walkbuiltin/test-walkbuiltin-0970.yaml#L42
42:1 [empty-lines] too many blank lines (1 > 0)
YAML Lint
Process completed with exit code 2.
Go Build (linux amd64)
Canceling since a higher priority waiting request for 'PR Check-7193' exists
Go Build (linux amd64)
The operation was canceled.
WASM
Canceling since a higher priority waiting request for 'PR Check-7193' exists
WASM
The operation was canceled.
Go Build (windows amd64)
Canceling since a higher priority waiting request for 'PR Check-7193' exists
Go Build (windows amd64)
The operation was canceled.
Go Test (linux)
Canceling since a higher priority waiting request for 'PR Check-7193' exists
Go Test (linux)
The operation was canceled.
Go compat build/test (ubuntu-22.04, 1.21)
Canceling since a higher priority waiting request for 'PR Check-7193' exists
Go compat build/test (ubuntu-22.04, 1.21)
The operation was canceled.
Go Build (linux arm64GO_TAGS="-tags=opa_no_oci")
Canceling since a higher priority waiting request for 'PR Check-7193' exists
Go Build (linux arm64GO_TAGS="-tags=opa_no_oci")
The operation was canceled.
Go Race Detector
Canceling since a higher priority waiting request for 'PR Check-7193' exists
Go Race Detector
The operation was canceled.
Go Build (linux arm64)
Canceling since a higher priority waiting request for 'PR Check-7193' exists
Go Build (linux arm64)
The operation was canceled.
Go compat build/test (macos-14, 1.21)
Canceling since a higher priority waiting request for 'PR Check-7193' exists
Go compat build/test (macos-14, 1.21)
The operation was canceled.
Go Test (darwin)
Canceling since a higher priority waiting request for 'PR Check-7193' exists
Go Test (darwin)
The operation was canceled.
Go Build (darwin amd64)
Canceling since a higher priority waiting request for 'PR Check-7193' exists
Go Build (darwin amd64)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
binaries-darwin-arm64
19.2 MB
generated
160 KB