GitHub docker testing #10689
ci.yaml
on: pull_request
Pre-build checks
11m 0s
Matrix: compile
Run fuzz regression tests
8m 42s
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
Matrix: min-btc-support
CI completion
0s
Annotations
28 errors
Test CLN liquid
Canceling since a higher priority waiting request for 'Continuous Integration-7571' exists
|
Test CLN liquid
The operation was canceled.
|
Valgrind Test CLN Valgrind (08/10)
Canceling since a higher priority waiting request for 'Continuous Integration-7571' exists
|
Valgrind Test CLN Valgrind (08/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (05/10)
Canceling since a higher priority waiting request for 'Continuous Integration-7571' exists
|
Valgrind Test CLN Valgrind (05/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (02/10)
Canceling since a higher priority waiting request for 'Continuous Integration-7571' exists
|
Valgrind Test CLN Valgrind (02/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (03/10)
Canceling since a higher priority waiting request for 'Continuous Integration-7571' exists
|
Valgrind Test CLN Valgrind (03/10)
The operation was canceled.
|
Test CLN postgres
Canceling since a higher priority waiting request for 'Continuous Integration-7571' exists
|
Test CLN postgres
The operation was canceled.
|
Valgrind Test CLN Valgrind (04/10)
Canceling since a higher priority waiting request for 'Continuous Integration-7571' exists
|
Valgrind Test CLN Valgrind (04/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (06/10)
Canceling since a higher priority waiting request for 'Continuous Integration-7571' exists
|
Valgrind Test CLN Valgrind (06/10)
The operation was canceled.
|
Test CLN gcc
Canceling since a higher priority waiting request for 'Continuous Integration-7571' exists
|
Test CLN gcc
The operation was canceled.
|
Valgrind Test CLN Valgrind (01/10)
Canceling since a higher priority waiting request for 'Continuous Integration-7571' exists
|
Valgrind Test CLN Valgrind (01/10)
The operation was canceled.
|
Test minimum supported BTC v25.0 with clang
Canceling since a higher priority waiting request for 'Continuous Integration-7571' exists
|
Test minimum supported BTC v25.0 with clang
The operation was canceled.
|
Valgrind Test CLN Valgrind (07/10)
Canceling since a higher priority waiting request for 'Continuous Integration-7571' exists
|
Valgrind Test CLN Valgrind (07/10)
The operation was canceled.
|
Test CLN splicing
Canceling since a higher priority waiting request for 'Continuous Integration-7571' exists
|
Test CLN splicing
The operation was canceled.
|
Test CLN clang
Canceling since a higher priority waiting request for 'Continuous Integration-7571' exists
|
Test CLN clang
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
cln-compile-clang-sanitizers.tar.bz2
Expired
|
179 MB |
|
cln-compile-clang.tar.bz2
Expired
|
122 MB |
|
cln-compile-gcc-O3.tar.bz2
Expired
|
152 MB |
|
cln-compile-gcc.tar.bz2
Expired
|
122 MB |
|