Skip to content

cp integration to 2.9.0rc1.dev20241219 #3795

cp integration to 2.9.0rc1.dev20241219

cp integration to 2.9.0rc1.dev20241219 #3795

Triggered via pull request December 19, 2024 12:25
Status Failure
Total duration 31s
Artifacts

continuous-integration.yaml

on: pull_request
Commit Checks
9s
Commit Checks
Decide Slack report
0s
Decide Slack report
Prepare versions and OS
0s
Prepare versions and OS
Start EC2 runner (Linux)
0s
Start EC2 runner (Linux)
Matrix: build-macos-intel
Matrix: build-linux
provenance  /  detect-env
provenance / detect-env
Stop EC2 runner (Linux)
0s
Stop EC2 runner (Linux)
Build Status (Linux)
0s
Build Status (Linux)
provenance  /  generator
provenance / generator
Slack report
0s
Slack report
Stop EC2 failure Slack alert
0s
Stop EC2 failure Slack alert
provenance  /  upload-assets
provenance / upload-assets
provenance  /  final
provenance / final
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Commit Checks
Process completed with exit code 1.
Commit Checks
Process completed with exit code 1.
Build Status (Linux)
Process completed with exit code 1.