Adds Velocity, ShearStress, StressDiagonal, observables #1163
ci.yml
on: pull_request
Matrix: tests
docs
3m 13s
pre-commit
2m 57s
coverage
0s
Annotations
8 errors
pre-commit
Process completed with exit code 1.
|
tests (3.9)
Process completed with exit code 2.
|
tests (3.10)
The job was canceled because "_3_9" failed.
|
tests (3.10)
Process completed with exit code 2.
|
tests (3.11)
The job was canceled because "_3_9" failed.
|
tests (3.11)
The operation was canceled.
|
tests (3.12)
The job was canceled because "_3_9" failed.
|
tests (3.12)
The operation was canceled.
|