Skip to content

per-commit

per-commit #21

Triggered via push November 10, 2023 11:40
Status Cancelled
Total duration 19m 46s
Artifacts 5
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

per-commit.yml

on: push
Matrix: code-formatting / check-style-clang-format
code-formatting  /  emacs-line
6s
code-formatting / emacs-line
code-formatting  /  spell-check
22s
code-formatting / spell-check
Matrix: compile
code-linting  /  clang-tidy-16
code-linting / clang-tidy-16
documentation  /  doxygen
documentation / doxygen
documentation  /  models
documentation / models
code-analysis  /  code-cov
code-analysis / code-cov
code-analysis  /  code-ql
code-analysis / code-ql
deploy-doc  /  deploy-doc
deploy-doc / deploy-doc
Fit to window
Zoom out
Zoom in

Annotations

1 error
compile (g++, optimized, test)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
per-commit-clang++-debug Expired
43.5 MB
per-commit-g++-debug Expired
70.1 MB
per-commit-g++-debug-disable-asserts Expired
70.1 MB
per-commit-g++-debug-disable-precompiled-headers Expired
68.4 MB
per-commit-g++-default Expired
125 MB