Skip to content

ci: Adds missing dependencies #6

ci: Adds missing dependencies

ci: Adds missing dependencies #6

Triggered via push September 9, 2024 23:07
Status Failure
Total duration 1m 11s
Artifacts

builds-linux.yml

on: push
Matrix: build-alpine
Matrix: build-gnu
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build-alpine (aarch64-unknown-linux-musl)
Process completed with exit code 101.
build-alpine (x86_64-unknown-linux-musl)
The job was canceled because "aarch64-unknown-linux-mus" failed.
build-alpine (x86_64-unknown-linux-musl)
The operation was canceled.
build-alpine (arm-unknown-linux-musleabihf)
The job was canceled because "aarch64-unknown-linux-mus" failed.
build-alpine (arm-unknown-linux-musleabihf)
The operation was canceled.