Skip to content

Merge pull request #45 from sanger-tol/dp24_spelling #177

Merge pull request #45 from sanger-tol/dp24_spelling

Merge pull request #45 from sanger-tol/dp24_spelling #177

Re-run triggered December 10, 2024 08:02
Status Failure
Total duration 4m 4s
Artifacts

ci.yml

on: push
Matrix: Run pipeline with test data
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 1 warning
Run pipeline with test data (22.10.1)
Process completed with exit code 1.
Run pipeline with test data (latest-everything)
The job was canceled because "_22_10_1" failed.
Run pipeline with test data (latest-everything)
The operation was canceled.
Run pipeline with test data (22.10.1)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636