BOLT: update to latest BOLT 3 test vectors. #12
ci.yaml
on: push
Pre-build checks
10m 57s
Matrix: compile
Run fuzz regression tests
8m 50s
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
Matrix: min-btc-support
CI completion
0s
Annotations
5 errors
Valgrind Test CLN Valgrind (10/10)
Process completed with exit code 1.
|
Test CLN clang
The job running on runner GitHub Actions 1 has exceeded the maximum execution time of 120 minutes.
|
Test CLN clang
The operation was canceled.
|
Test CLN splicing
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 120 minutes.
|
Test CLN splicing
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
cln-compile-clang-sanitizers.tar.bz2
|
180 MB |
|
cln-compile-clang.tar.bz2
|
123 MB |
|
cln-compile-gcc-O3.tar.bz2
|
152 MB |
|
cln-compile-gcc.tar.bz2
|
122 MB |
|