Run clippy checks in CI #90
rust.yml
on: pull_request
Matrix: Tests
Clippy
11s
Check building with the MSRV
1m 11s
Rustfmt
17s
success
0s
Annotations
14 errors and 2 warnings
Clippy
Process completed with exit code 101.
|
Tests (nightly, windows-2025)
Process completed with exit code 1.
|
Tests (nightly, macos-13)
The job was canceled because "nightly_windows-2025" failed.
|
Tests (stable, windows-2025)
The job was canceled because "nightly_windows-2025" failed.
|
Tests (stable, windows-2025)
Process completed with exit code 1.
|
Tests (1.63.0, windows-2025)
The job was canceled because "nightly_windows-2025" failed.
|
Tests (1.63.0, windows-2025)
The operation was canceled.
|
Tests (1.63.0, ubuntu-24.04)
The job was canceled because "nightly_windows-2025" failed.
|
Tests (1.63.0, ubuntu-24.04)
The operation was canceled.
|
Tests (1.63.0, macos-15)
The job was canceled because "nightly_windows-2025" failed.
|
Tests (1.63.0, macos-15)
The operation was canceled.
|
Tests (1.63.0, macos-13)
The job was canceled because "nightly_windows-2025" failed.
|
Tests (1.63.0, macos-13)
The operation was canceled.
|
success
Process completed with exit code 1.
|
Rustfmt
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
success
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|