Skip to content

Continuous Integration #639

Continuous Integration

Continuous Integration #639

Triggered via schedule January 6, 2025 08:28
Status Failure
Total duration 54s
Artifacts

ci.yaml

on: schedule
Matrix: Integration test suite
Matrix: Linting and tests
Fit to window
Zoom out
Zoom in

Annotations

10 errors and 2 warnings
Linting and tests (8)
Process completed with exit code 127.
Linting and tests (17)
The job was canceled because "_8" failed.
Linting and tests (17)
Process completed with exit code 127.
Linting and tests (11)
The job was canceled because "_8" failed.
Linting and tests (11)
The operation was canceled.
Integration test suite (8)
Process completed with exit code 1.
Integration test suite (17)
The job was canceled because "_8" failed.
Integration test suite (17)
Process completed with exit code 1.
Integration test suite (11)
The job was canceled because "_8" failed.
Integration test suite (11)
The operation was canceled.
Linting and tests (8)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Integration test suite (8)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636