Skip to content

Commit

Permalink
diagram network setup
Browse files Browse the repository at this point in the history
Signed-off-by: Marc Schöchlin <[email protected]>
  • Loading branch information
scoopex committed Dec 10, 2024
1 parent dabe6ac commit 110cd21
Show file tree
Hide file tree
Showing 2 changed files with 6 additions and 0 deletions.
4 changes: 4 additions & 0 deletions docs/src/overview/Implementation-Overview.drawio.svg
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
2 changes: 2 additions & 0 deletions docs/src/overview/networking.md
Original file line number Diff line number Diff line change
Expand Up @@ -190,6 +190,8 @@ Reference: See the [CLOS overview picture](#CLOS)
| Management Switch | Connected to the management port of each of the network switches. |


![Illustration about the implementation](Implementation-Overview.drawio.svg)

Tenant servers are organized into a layer called projects. In case those tenant servers require access to or from external networks, a new tenant server to function as a firewall is created. Leaf and spine switches form the fundament of the CLOS network to facilitate redundancy, resilience and scalability. Exit switches establish connectivity to or from external networks. Management Switch and Management Server are mandatory parts that build a management network to access the network switches for administration.

To operate the CLOS topology, software defined configuration to enable BGP, VRF, EVPN and VXLAN must be set up.
Expand Down

0 comments on commit 110cd21

Please sign in to comment.