Skip to content

[CI] Do not use prereleases #5728

[CI] Do not use prereleases

[CI] Do not use prereleases #5728

Triggered via pull request November 28, 2024 11:27
Status Failure
Total duration 6h 0m 28s
Artifacts
Matrix: test-integration-vizro-core
Fit to window
Zoom out
Zoom in

Annotations

12 errors
test-integration-vizro-core on Py3.10
The job running on runner GitHub Actions 121 has exceeded the maximum execution time of 360 minutes.
test-integration-vizro-core on Py3.10
The operation was canceled.
test-integration-vizro-core on Py3.13
The job running on runner GitHub Actions 194 has exceeded the maximum execution time of 360 minutes.
test-integration-vizro-core on Py3.13
The operation was canceled.
test-integration-vizro-core on Py3.11
The job running on runner GitHub Actions 382 has exceeded the maximum execution time of 360 minutes.
test-integration-vizro-core on Py3.11
The operation was canceled.
test-integration-vizro-core on Py3.9 lower bounds
The job running on runner GitHub Actions 283 has exceeded the maximum execution time of 360 minutes.
test-integration-vizro-core on Py3.9 lower bounds
The operation was canceled.
test-integration-vizro-core on Py3.9
The job running on runner GitHub Actions 380 has exceeded the maximum execution time of 360 minutes.
test-integration-vizro-core on Py3.9
The operation was canceled.
test-integration-vizro-core on Py3.12
The job running on runner GitHub Actions 116 has exceeded the maximum execution time of 360 minutes.
test-integration-vizro-core on Py3.12
The operation was canceled.