[CI] Do not use prereleases #5727
Triggered via pull request
November 28, 2024 11:10
Status
Failure
Total duration
6h 0m 25s
Artifacts
–
test-integration-vizro-core.yml
on: pull_request
Matrix: test-integration-vizro-core
Annotations
12 errors
test-integration-vizro-core on Py3.11
The job running on runner GitHub Actions 254 has exceeded the maximum execution time of 360 minutes.
|
test-integration-vizro-core on Py3.11
The operation was canceled.
|
test-integration-vizro-core on Py3.9 lower bounds
The job running on runner GitHub Actions 359 has exceeded the maximum execution time of 360 minutes.
|
test-integration-vizro-core on Py3.9 lower bounds
The operation was canceled.
|
test-integration-vizro-core on Py3.12
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 360 minutes.
|
test-integration-vizro-core on Py3.12
The operation was canceled.
|
test-integration-vizro-core on Py3.9
The job running on runner GitHub Actions 410 has exceeded the maximum execution time of 360 minutes.
|
test-integration-vizro-core on Py3.9
The operation was canceled.
|
test-integration-vizro-core on Py3.13
The job running on runner GitHub Actions 334 has exceeded the maximum execution time of 360 minutes.
|
test-integration-vizro-core on Py3.13
The operation was canceled.
|
test-integration-vizro-core on Py3.10
The job running on runner GitHub Actions 107 has exceeded the maximum execution time of 360 minutes.
|
test-integration-vizro-core on Py3.10
The operation was canceled.
|