Skip to content

fix: Update CI to add GHC 9.8 #41

fix: Update CI to add GHC 9.8

fix: Update CI to add GHC 9.8 #41

Triggered via pull request May 2, 2024 17:02
Status Failure
Total duration 1m 23s
Artifacts

ci.yml

on: pull_request
Matrix: cabal
Matrix: stack
Fit to window
Zoom out
Zoom in

Annotations

60 errors
ubuntu-latest / ghc 9.6 / cabal-3.8
The process '/home/runner/.ghcup/bin/cabal' failed with exit code 1
macOS-latest / ghc 8.10 / cabal-latest
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
macOS-latest / ghc 9.0 / cabal-latest
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
macOS-latest / ghc 9.4 / cabal-latest
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
macOS-latest / ghc 9.6 / cabal-3.8
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
macOS-latest / ghc 9.8 / cabal-latest
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
macOS-latest / ghc 9.6 / cabal-latest
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
ubuntu-latest / ghc 9.8 / cabal-latest
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
windows-latest / ghc 8.10 / cabal-3.8
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
ubuntu-latest / ghc 9.0 / cabal-latest
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
macOS-latest / ghc 9.2 / cabal-latest
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
windows-latest / ghc 9.0 / cabal-3.8
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
windows-latest / ghc 9.2 / cabal-3.8
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
windows-latest / ghc 9.8 / cabal-3.8
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
windows-latest / ghc 9.6 / cabal-3.8
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
ubuntu-latest / ghc 9.6 / cabal-latest
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
windows-latest / ghc 8.10 / cabal-latest
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
windows-latest / ghc 9.0 / cabal-latest
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
windows-latest / ghc 9.2 / cabal-latest
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
windows-latest / ghc 9.4 / cabal-latest
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
windows-latest / ghc 9.4 / cabal-3.8
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
windows-latest / ghc 9.8 / cabal-latest
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
ubuntu-latest / ghc 9.2 / cabal-latest
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
ubuntu-latest / ghc 9.2 / cabal-latest
The operation was canceled.
windows-latest / ghc 9.6 / cabal-latest
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
ubuntu-latest / ghc 8.10 / cabal-3.8
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
ubuntu-latest / ghc 9.8 / cabal-3.8
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
ubuntu-latest / ghc 8.10 / cabal-3.8
The operation was canceled.
ubuntu-latest / ghc 9.8 / cabal-3.8
The process '/home/runner/.ghcup/bin/cabal' failed with exit code 1
ubuntu-latest / ghc 8.10 / cabal-latest
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
ubuntu-latest / ghc 8.10 / cabal-latest
The operation was canceled.
macOS-latest / ghc 9.8 / cabal-3.8
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
macOS-latest / ghc 9.8 / cabal-3.8
The operation was canceled.
ubuntu-latest / ghc 9.0 / cabal-3.8
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
ubuntu-latest / ghc 9.0 / cabal-3.8
The operation was canceled.
ubuntu-latest / ghc 9.4 / cabal-3.8
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
ubuntu-latest / ghc 9.4 / cabal-3.8
The operation was canceled.
macOS-latest / ghc 9.4 / cabal-3.8
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
macOS-latest / ghc 9.4 / cabal-3.8
The operation was canceled.
ubuntu-latest / ghc 9.4 / cabal-latest
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
ubuntu-latest / ghc 9.4 / cabal-latest
The operation was canceled.
macOS-latest / ghc 9.2 / cabal-3.8
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
macOS-latest / ghc 9.2 / cabal-3.8
The operation was canceled.
ubuntu-latest / ghc 9.2 / cabal-3.8
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
ubuntu-latest / ghc 9.2 / cabal-3.8
The operation was canceled.
macOS-latest / ghc 8.10 / cabal-3.8
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
macOS-latest / ghc 8.10 / cabal-3.8
The operation was canceled.
macOS-latest / ghc 9.0 / cabal-3.8
The job was canceled because "ubuntu-latest_3_8_9_6" failed.
macOS-latest / ghc 9.0 / cabal-3.8
The operation was canceled.
stack / ghc 9.6
Process completed with exit code 1.
stack / ghc 9.0
The job was canceled because "_9_6_ubuntu-latest" failed.
stack / ghc 9.0
The operation was canceled.
stack / ghc 8.10
The job was canceled because "_9_6_ubuntu-latest" failed.
stack / ghc 8.10
The operation was canceled.
stack / ghc 9.8
The job was canceled because "_9_6_ubuntu-latest" failed.
stack / ghc 9.8
Process completed with exit code 1.
stack / ghc 9.4
The job was canceled because "_9_6_ubuntu-latest" failed.
stack / ghc 9.4
The operation was canceled.
stack / ghc 9.2
The job was canceled because "_9_6_ubuntu-latest" failed.
stack / ghc 9.2
The operation was canceled.