Skip to content

UBO consolidation #5734

UBO consolidation

UBO consolidation #5734

Triggered via pull request January 7, 2025 13:26
Status Cancelled
Total duration 1h 8m 0s
Artifacts 1

linux-ci.yml

on: pull_request
Matrix: linux-build-and-test
Linux CI Result
0s
Linux CI Result
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 4 warnings
linux-build-and-test (vulkan)
Canceling since a higher priority waiting request for 'linux-ci-refs/pull/3089/merge' exists
linux-build-and-test (vulkan)
The operation was canceled.
linux-build-and-test (legacy)
Canceling since a higher priority waiting request for 'linux-ci-refs/pull/3089/merge' exists
linux-build-and-test (legacy)
The operation was canceled.
linux-build-and-test (drawable)
Canceling since a higher priority waiting request for 'linux-ci-refs/pull/3089/merge' exists
linux-build-and-test (drawable)
The operation was canceled.
Linux CI Result
Process completed with exit code 1.
linux-build-and-test (vulkan)
Failed to save: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 1
linux-build-and-test (vulkan)
Timed out waiting for analysis to finish processing. Continuing.
linux-build-and-test (legacy)
Timed out waiting for analysis to finish processing. Continuing.
linux-build-and-test (drawable)
Timed out waiting for analysis to finish processing. Continuing.

Artifacts

Produced during runtime
Name Size
coverage-report
456 KB