UBO consolidation #5685
Triggered via pull request
December 12, 2024 23:51
Status
Cancelled
Total duration
27m 31s
Artifacts
–
linux-ci.yml
on: pull_request
pre_job
2m 46s
linux-coverage
5m 5s
Matrix: linux-build-and-test
Linux CI Result
0s
Annotations
8 errors
linux-coverage
Process completed with exit code 1.
|
linux-build-and-test (legacy)
Canceling since a higher priority waiting request for 'linux-ci-refs/pull/3089/merge' exists
|
linux-build-and-test (legacy)
The operation was canceled.
|
linux-build-and-test (vulkan)
Canceling since a higher priority waiting request for 'linux-ci-refs/pull/3089/merge' exists
|
linux-build-and-test (vulkan)
The operation was canceled.
|
linux-build-and-test (drawable)
Canceling since a higher priority waiting request for 'linux-ci-refs/pull/3089/merge' exists
|
linux-build-and-test (drawable)
The operation was canceled.
|
Linux CI Result
Process completed with exit code 1.
|