Skip to content

Symbol UBO consolidation #5640

Symbol UBO consolidation

Symbol UBO consolidation #5640

Triggered via pull request December 3, 2024 14:17
Status Cancelled
Total duration 6m 4s
Artifacts

linux-ci.yml

on: pull_request
Matrix: linux-build-and-test
Linux CI Result
0s
Linux CI Result
Fit to window
Zoom out
Zoom in

Annotations

9 errors
linux-build-and-test (legacy)
Canceling since a higher priority waiting request for 'linux-ci-refs/pull/2339/merge' exists
linux-build-and-test (legacy)
The operation was canceled.
linux-coverage
Canceling since a higher priority waiting request for 'linux-ci-refs/pull/2339/merge' exists
linux-coverage
The operation was canceled.
linux-build-and-test (vulkan)
Canceling since a higher priority waiting request for 'linux-ci-refs/pull/2339/merge' exists
linux-build-and-test (vulkan)
The operation was canceled.
linux-build-and-test (drawable)
Canceling since a higher priority waiting request for 'linux-ci-refs/pull/2339/merge' exists
linux-build-and-test (drawable)
The operation was canceled.
Linux CI Result
Process completed with exit code 1.