fix: update goproxy url #54
build-and-test.yml
on: pull_request
Matrix: cross-compile
Matrix: integration-tests-matrix
Matrix: lint-matrix
Matrix: unittest-matrix
checks
0s
publish-stable
0s
Annotations
13 errors
govulncheck (processor)
The job running on runner GitHub Actions 8 has exceeded the maximum execution time of 30 minutes.
|
govulncheck (processor)
The operation was canceled.
|
govulncheck (extension)
The job running on runner GitHub Actions 54 has exceeded the maximum execution time of 30 minutes.
|
govulncheck (extension)
The operation was canceled.
|
setup-environment
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 30 minutes.
|
setup-environment
The operation was canceled.
|
govulncheck (cmd)
The job running on runner GitHub Actions 21 has exceeded the maximum execution time of 30 minutes.
|
govulncheck (cmd)
The operation was canceled.
|
govulncheck (internal)
The job running on runner GitHub Actions 20 has exceeded the maximum execution time of 30 minutes.
|
govulncheck (internal)
The operation was canceled.
|
lint
Process completed with exit code 1.
|
integration-tests
Process completed with exit code 1.
|
unittest
Process completed with exit code 1.
|