chore(deps): update konflux references (main) #1203
Merged
Red Hat Konflux / Red Hat Konflux / forklift-controller-on-pull-request
succeeded
Dec 2, 2024 in 7m 20s
Success
Red Hat Konflux/forklift-controller-on-pull-request has successfully validated your commit.
Details
- Namespace: rh-mtv-1-tenant
- PipelineRun: forklift-controller-on-pull-request-5tgcd
Task Statuses:
Status | Duration | Name |
---|---|---|
β Succeeded | 8 seconds | |
β Succeeded | 24 seconds | |
β Succeeded | 7 seconds | |
β Succeeded | 3 minutes | |
β Succeeded | 8 seconds | |
β Succeeded | 19 seconds | |
β Succeeded | 9 seconds | |
β Succeeded | 17 seconds | |
β Succeeded | 9 seconds | |
β Succeeded | 24 seconds | |
β Succeeded | 59 seconds | |
β Succeeded | 11 seconds | |
β Succeeded | 11 seconds | |
β Succeeded | 6 seconds |
Loading