Skip to content

deps: update golang.org/x/exp digest to 93d18d7 #16233

deps: update golang.org/x/exp digest to 93d18d7

deps: update golang.org/x/exp digest to 93d18d7 #16233

Triggered via pull request April 9, 2024 20:24
Status Failure
Total duration 4m 7s
Artifacts 2

CI.yaml

on: pull_request
Prepare CI Run
4s
Prepare CI Run
Matrix: Build Docker Image
Store tag of the built images
2s
Store tag of the built images
Component Tests  /  Component Tests
3m 42s
Component Tests / Component Tests
Matrix: Unit Tests
Load Tests  /  Run load Tests
Load Tests / Run load Tests
Matrix: End to End Tests / Run E2E Tests
Waiting for pending jobs
Matrix: Publish helm chart changes to charts repo
Matrix: Integration Tests
Waiting for pending jobs
Fit to window
Zoom out
Zoom in

Annotations

16 errors
Unit Tests (metrics-operator, metrics-operator/)
Process completed with exit code 2.
Unit Tests (certificate-operator, keptn-cert-manager/)
The job was canceled because "metrics-operator_metrics-" failed.
Unit Tests (certificate-operator, keptn-cert-manager/)
The operation was canceled.
Unit Tests (scheduler, scheduler/)
The job was canceled because "metrics-operator_metrics-" failed.
Unit Tests (scheduler, scheduler/)
The operation was canceled.
Unit Tests (lifecycle-operator, lifecycle-operator/)
The job was canceled because "metrics-operator_metrics-" failed.
Unit Tests (lifecycle-operator, lifecycle-operator/)
The operation was canceled.
Build Docker Image (python-runtime, runtimes/python-runtime/)
The job was canceled because "metrics-operator_metrics-" failed.
Build Docker Image (python-runtime, runtimes/python-runtime/)
The operation was canceled.
Build Docker Image (certificate-operator, keptn-cert-manager/)
The job was canceled because "metrics-operator_metrics-" failed.
Build Docker Image (certificate-operator, keptn-cert-manager/)
The operation was canceled.
Build Docker Image (lifecycle-operator, lifecycle-operator/)
The job was canceled because "metrics-operator_metrics-" failed.
Build Docker Image (lifecycle-operator, lifecycle-operator/)
The operation was canceled.
Build Docker Image (scheduler, scheduler/)
The job was canceled because "metrics-operator_metrics-" failed.
Build Docker Image (scheduler, scheduler/)
The operation was canceled.
Build Docker Image (metrics-operator, metrics-operator/)
buildx failed with: ERROR: failed to solve: process "/bin/sh -c controller-gen object:headerFile=\"hack/boilerplate.go.txt\" paths=\"./...\" && GOOS=$TARGETOS GOARCH=$TARGETARCH go build -ldflags \" -w -X common.gitCommit=${GIT_HASH} -X common.buildTime=${BUILD_TIME} -X common.buildVersion=${RELEASE_VERSION}\" -o bin/manager main.go" did not complete successfully: exit code: 1

Artifacts

Produced during runtime
Name Size
deno-runtime-image.tar Expired
112 MB
dev-202404092024 Expired
123 Bytes