Skip to content

chore(deps): update dependency conventional-changelog-conventionalcom… #2933

chore(deps): update dependency conventional-changelog-conventionalcom…

chore(deps): update dependency conventional-changelog-conventionalcom… #2933

Status Failure
Total duration 5m 19s
Artifacts

test.yml

on: push
Matrix: test_matrix
required_check
0s
required_check
Fit to window
Zoom out
Zoom in

Annotations

16 errors and 1 warning
test_matrix (macos-latest, 18)
Process completed with exit code 1.
test_matrix (ubuntu-latest, 18)
The job was canceled because "macos-latest_18" failed.
test_matrix (ubuntu-latest, 20)
The job was canceled because "macos-latest_18" failed.
test_matrix (macos-latest, 21)
The job was canceled because "macos-latest_18" failed.
test_matrix (macos-latest, 21)
The operation was canceled.
test_matrix (macos-latest, 20)
The job was canceled because "macos-latest_18" failed.
test_matrix (macos-latest, 20)
The operation was canceled.
test_matrix (windows-latest, 21)
The job was canceled because "macos-latest_18" failed.
test_matrix (windows-latest, 21)
The operation was canceled.
test_matrix (windows-latest, 18)
The job was canceled because "macos-latest_18" failed.
test_matrix (windows-latest, 18)
The operation was canceled.
test_matrix (windows-latest, 20)
The job was canceled because "macos-latest_18" failed.
test_matrix (windows-latest, 20)
The operation was canceled.
test_matrix (ubuntu-latest, 21)
The job was canceled because "macos-latest_18" failed.
test_matrix (ubuntu-latest, 21)
The operation was canceled.
required_check
Process completed with exit code 1.
required_check
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636