Skip to content

refactoring

refactoring #9

Triggered via push August 8, 2024 18:49
Status Failure
Total duration 44s
Artifacts

ci.yml

on: push
Matrix: test
coverage
0s
coverage
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test (3.12)
Process completed with exit code 1.
test (3.11)
The job was canceled because "_3_12" failed.
test (3.11)
Process completed with exit code 1.
test (3.9)
The job was canceled because "_3_12" failed.
test (3.10)
The job was canceled because "_3_12" failed.
test (3.10)
The operation was canceled.