Digital (and occasionally physical) design studies involving integrated timber joints (itj) using the clamp assembly strategy developed in the PhD project Robotic Assembled Timber Structures with Integral Timber Joints.
Architectural design files (Rhino 3D files) are organized in folders related to a specific topic of investigation. The folder naming convention is /yymmdd_study_name . The following list provides an index of the studies:
(Assembly Study) 191101_manual_assembly_two_walls
A design to demonstrate the complexity of assembling two intersecting walls that shares a common element.
Physical Prototype | Digital Model | AssemSim | StructuralSim | Evaluation |
---|---|---|---|---|
Manual Joint Cutting Manual Assembly (2ppl) |
Modeled (Rhino) | None | None | Discussion |
(Joint Detail) 191200_joint_guidance_strategy
Design study of joint details that can assist alignment. Different joint details (e.g. mating-face tapering, edge chamfering) are modeled.
Physical Prototype | Digital Model | AssemSim | StructuralSim | Evaluation |
---|---|---|---|---|
3D Printed Prototype Manual Joint Cutting |
Modeled (Rhino) | None | None | None |
This repository was created by Pok Yin Victor Leung [email protected] @yck011522 at @gramaziokohler