it-schedule #767
it-schedule.yml
on: schedule
integration-test
2h 39m
Annotations
3 warnings
integration-test
Test report summary exceeded limit of 65535 bytes and will be trimmed
|
integration-test
Failed to save: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|
integration-test
You are running out of disk space. The runner will stop working when the machine runs out of disk space. Free space left: 0 MB
|