Skip to content

debug

debug #31

Triggered via push October 5, 2023 10:46
Status Failure
Total duration 4m 40s
Artifacts

integration.yml

on: push
integration-cvmfs
4m 26s
integration-cvmfs
ext-lhcb_integration
2m 59s
ext-lhcb_integration
Matrix: integration-local_install
Matrix: matching
Fit to window
Zoom out
Zoom in

Annotations

15 errors
integration-local_install (2.7.18, rel-v8r0)
Process completed with exit code 255.
integration-local_install (2.7.18, integration)
Process completed with exit code 255.
integration-local_install (3.9.17, integration)
The job was canceled because "_2_7_18_integration" failed.
integration-local_install (3.9.17, integration)
The operation was canceled.
matching (2.7.18)
Process completed with exit code 255.
integration-local_install (3.6.15, rel-v8r0)
The job was canceled because "_2_7_18_integration" failed.
integration-local_install (3.6.15, rel-v8r0)
The operation was canceled.
integration-local_install (3.6.15, integration)
The job was canceled because "_2_7_18_integration" failed.
integration-local_install (3.6.15, integration)
The operation was canceled.
integration-local_install (3.9.17, rel-v8r0)
The job was canceled because "_2_7_18_integration" failed.
integration-local_install (3.9.17, rel-v8r0)
The operation was canceled.
matching (3.9.17)
The job was canceled because "_2_7_18" failed.
matching (3.9.17)
The operation was canceled.
matching (3.6.15)
The job was canceled because "_2_7_18" failed.
matching (3.6.15)
The operation was canceled.