Cancel previous CI runs #20
test.yml
on: push
Build
20s
generate
15s
Matrix: Acceptance Test
Annotations
8 errors
Acceptance Test (1.8.*, 4.0.7)
Canceling since a higher priority waiting request for 'refs/heads/main' exists
|
Acceptance Test (1.8.*, 4.0.7)
The operation was canceled.
|
Acceptance Test (1.9.*, 4.0.7)
Canceling since a higher priority waiting request for 'refs/heads/main' exists
|
Acceptance Test (1.9.*, 4.0.7)
The operation was canceled.
|
Acceptance Test (1.9.*, 3.7.8)
Canceling since a higher priority waiting request for 'refs/heads/main' exists
|
Acceptance Test (1.9.*, 3.7.8)
The operation was canceled.
|
Acceptance Test (1.8.*, 3.7.8)
Canceling since a higher priority waiting request for 'refs/heads/main' exists
|
Acceptance Test (1.8.*, 3.7.8)
The operation was canceled.
|