Skip to content

Release v0.3.0: Migrate essential logic to V9 #26

Release v0.3.0: Migrate essential logic to V9

Release v0.3.0: Migrate essential logic to V9 #26

Triggered via pull request September 18, 2024 07:50
Status Cancelled
Total duration 24s
Artifacts

pr.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
test (3.9)
The run was canceled by @nifadyev.
test (3.9)
The operation was canceled.
test (3.10)
The run was canceled by @nifadyev.
test (3.10)
The operation was canceled.
test (3.11)
The run was canceled by @nifadyev.
test (3.11)
The operation was canceled.
test (3.8)
The run was canceled by @nifadyev.
test (3.8)
The operation was canceled.
test (3.12)
The run was canceled by @nifadyev.
test (3.12)
The operation was canceled.