Add manual testing for accepting dual-funded channels #752
build.yml
on: push
coverage
6m 32s
benchmark
18m 26s
check_commits
18m 58s
check_release
1m 57s
fuzz
1h 21m
linting
1m 9s
rustfmt
11s
incremental-mutants
1h 37m
Matrix: build
Annotations
12 errors
build (macos-latest, beta)
Process completed with exit code 101.
|
build (macos-latest, stable)
Process completed with exit code 101.
|
build (ubuntu-latest, beta)
Process completed with exit code 101.
|
build (ubuntu-latest, stable)
Process completed with exit code 101.
|
build (macos-latest, 1.63.0)
Process completed with exit code 101.
|
build (ubuntu-latest, 1.63.0)
Process completed with exit code 101.
|
build (windows-latest, beta)
Process completed with exit code 101.
|
build (windows-latest, stable)
Process completed with exit code 101.
|
incremental-mutants
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
incremental-mutants
The operation was canceled.
|
build (windows-latest, 1.63.0)
The job running on runner GitHub Actions 14 has exceeded the maximum execution time of 360 minutes.
|
build (windows-latest, 1.63.0)
The operation was canceled.
|