Skip to content

fix(90multipath): drop unneeded dependencies from configure service #2363

fix(90multipath): drop unneeded dependencies from configure service

fix(90multipath): drop unneeded dependencies from configure service #2363

Triggered via pull request January 17, 2024 01:52
Status Failure
Total duration 36m 33s
Artifacts

integration.yml

on: pull_request
Matrix: network
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
network (fedora:latest, network-manager, 20)
Process completed with exit code 2.
network (fedora:latest, network-legacy, 20)
Process completed with exit code 2.
test (opensuse:latest, 16)
Process completed with exit code 2.
test (opensuse:latest, 18)
Process completed with exit code 2.
test (opensuse:latest, 14)
Process completed with exit code 2.
test (opensuse:latest, 13)
Process completed with exit code 2.
test (opensuse:latest, 03)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 30 minutes.
test (opensuse:latest, 03)
The operation was canceled.