chore: bump ic-certification #6177
Triggered via pull request
January 17, 2024 23:50
Status
Cancelled
Total duration
1m 18s
Artifacts
–
prepare-dfx-assets.yml
on: pull_request
Matrix: prepare
prepare-dfx-assets:required
0s
Annotations
5 errors
prepare (macos-latest)
Canceling since a higher priority waiting request for 'Check dfx asset preparation-refs/pull/3512/merge' exists
|
prepare (macos-latest)
The operation was canceled.
|
prepare (ubuntu-latest)
Canceling since a higher priority waiting request for 'Check dfx asset preparation-refs/pull/3512/merge' exists
|
prepare (ubuntu-latest)
The operation was canceled.
|
prepare-dfx-assets:required
Process completed with exit code 1.
|