Jobs scheduling

Model

Variables

The scheduling involves assigning people to a set of given tasks.

A person is represented by :

  • its name
  • its age
  • whether the person is suited for being in charge of the other persons for a given task.
  • its availability for different hours

A job/task is represented by :

  • an id
  • timetable. For ease of modelling, the start time and end time of the shift is taken in hours from a given reference point. This avoids confusion when shifts are in-between days (e.g. 23h00-02h00).
  • number of people needed
  • need for major people only

To model the person-task assignment, we create the binary variables representing all the possible pair (person, task). A schedule is an assignment (0 if the person was not assigned to the job, 1 if yes) to all these binary variables.

Constraints

We have the following constraints on the schedule :

  • Hard constraints :
    • A person cannot be assigned to 2 tasks that overlap
    • A person cannot be assigned to a task where she/he is not available
    • A person must have at least min_nb_tasks assigned
    • A person must have at most max_nb_tasks assigned
    • A task requiring only major persons cannot have minor persons assigned to itself
    • A task must have the required number of persons
  • Soft constraints :
    • A person should not do 2 tasks in a row
    • A task should always have at least 1 person that can be in charge
    • Tasks should be assigned approximately evenly among all the persons