Skip to content

chore: supertape: v8.7.0 #290

chore: supertape: v8.7.0

chore: supertape: v8.7.0 #290

Triggered via push November 27, 2023 17:01
Status Failure
Total duration 2m 2s
Artifacts

nodejs.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build (21.x)
Process completed with exit code 1.
build (16.x)
The job was canceled because "_21_x" failed.
build (16.x)
The operation was canceled.
build (20.x)
The job was canceled because "_21_x" failed.
build (20.x)
The operation was canceled.
build (18.x)
The operation was canceled.