Skip to content

chore: appease linter #1180

chore: appease linter

chore: appease linter #1180

Triggered via push January 18, 2024 19:26
Status Cancelled
Total duration 9m 16s
Artifacts

commit.yaml

on: push
Matrix: build_posix
Matrix: coverage
Matrix: darglint
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build_posix (ubuntu-latest, 3.11)
Process completed with exit code 1.
build_posix (macos-latest, 3.11)
The job was canceled because "ubuntu-latest_3_11" failed.
build_posix (macos-latest, 3.11)
The operation was canceled.
build_posix (macos-latest, 3.10)
The job was canceled because "ubuntu-latest_3_11" failed.
build_posix (macos-latest, 3.10)
The operation was canceled.
build_posix (macos-latest, 3.8)
The job was canceled because "ubuntu-latest_3_11" failed.
build_posix (macos-latest, 3.8)
The operation was canceled.
darglint (ubuntu-latest, 3.11)
The run was canceled by @carlmontanari.
darglint (ubuntu-latest, 3.11)
The operation was canceled.