[MISC] Update microk8s to 1.28 #963
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
ci.yaml
on: pull_request
Build charms
/
...
/
Get workflow version
3s
Matrix: Build charms / build
Matrix: integration-test
Annotations
12 errors
tls-integration | 3.1.5
The run was canceled by @dragomirp.
|
tls-integration | 3.1.5
The operation was canceled.
|
standalone-integration | 2.9.44
The run was canceled by @dragomirp.
|
standalone-integration | 2.9.44
The operation was canceled.
|
scaling-integration | 3.1.5
The run was canceled by @dragomirp.
|
scaling-integration | 3.1.5
The operation was canceled.
|
client-relation-integration | 3.1.5
The run was canceled by @dragomirp.
|
client-relation-integration | 3.1.5
The operation was canceled.
|
client-relation-integration | 2.9.44
The run was canceled by @dragomirp.
|
client-relation-integration | 2.9.44
The operation was canceled.
|
tls-integration | 2.9.44
The run was canceled by @dragomirp.
|
tls-integration | 2.9.44
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
charms-packed-with-cache
Expired
|
30.1 MB |
|