chore: GHA to smoke test against last released exemplar #7833
ci.yml
on: pull_request
Shard Infrastructure Tests
3s
Shard Integration Tests
7s
Test Go
4m 48s
Test README
2m 1s
Test Scripts
11s
SQL
43s
Ensure Frozen Migrations
10s
Lint
2m 12s
Proto Breaking Change Check
8s
Console
1m 22s
VSCode Extension
59s
Intellij Plugin
3m 7s
Rebuild All
3m 7s
Build Docs
5s
Lint Architecture
10s
Build Controller Docker Image
3m 18s
Build Runner Docker Image
3m 21s
Build Box Docker Image
2m 47s
Console e2e
4m 1s
Smoke Test Upgrade Path
8s
Matrix: Infrastructure Test
Matrix: Integration Test
Integration Success
0s
Annotations
7 errors and 2 warnings
Smoke Test Upgrade Path
Process completed with exit code 1.
|
Integration Test (TestRetry)
Canceling since a higher priority waiting request for 'refs/pull/2983/merge-ci' exists
|
Integration Test (TestPubSub)
Canceling since a higher priority waiting request for 'refs/pull/2983/merge-ci' exists
|
Integration Test (TestPubSub)
The operation was canceled.
|
Integration Test (TestConsumptionDelay)
Canceling since a higher priority waiting request for 'refs/pull/2983/merge-ci' exists
|
Infrastructure Test (TestKubeScaling)
Canceling since a higher priority waiting request for 'refs/pull/2983/merge-ci' exists
|
Infrastructure Test (TestKubeScaling)
The operation was canceled.
|
Smoke Test Upgrade Path
No files were found with the provided path: /tmp/ftl-kube-report/. No artifacts will be uploaded.
|
Infrastructure Test (TestKubeScaling)
No files were found with the provided path: /tmp/ftl-kube-report/. No artifacts will be uploaded.
|