Skip to content

MANGO-1216 feat(GHA/CI/CD): move to GHA #8

MANGO-1216 feat(GHA/CI/CD): move to GHA

MANGO-1216 feat(GHA/CI/CD): move to GHA #8

Triggered via push July 22, 2024 09:32
Status Failure
Total duration 18s
Artifacts

ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
tests on Ruby 3.1
The process '/opt/hostedtoolcache/Ruby/3.1.6/x64/bin/bundle' failed with exit code 6
tests on Ruby 3.2
The job was canceled because "_3_1" failed.
tests on Ruby 3.2
Process completed with exit code 1.
tests on Ruby 3
The job was canceled because "_3_1" failed.
tests on Ruby 3
The operation was canceled.
tests on Ruby 3.3
The job was canceled because "_3_1" failed.
tests on Ruby 3.3
The operation was canceled.
tests on Ruby 2.7
The job was canceled because "_3_1" failed.
tests on Ruby 2.7
The operation was canceled.