rustls #58
build.yml
on: schedule
MSRV
2m 49s
Features
1m 43s
BoGo test suite
2m 20s
Smoke-test fuzzing targets
3m 14s
Run benchmarks
7m 52s
Check for documentation errors
1m 57s
Measure coverage
3m 58s
Check minimum versions of direct dependencies
38s
Check semver compatibility
1m 0s
Format
13s
Format (unstable)
18s
Clippy
2m 42s
Clippy (Nightly)
2m 35s
Validate external types appearing in public API
1m 27s
Run openssl-tests
1m 26s
Matrix: Build+test
Matrix: cross-target testing
Annotations
26 errors and 1 warning
cross-target testing (i586-unknown-linux-gnu)
Process completed with exit code 101.
|
cross-target testing (s390x-unknown-linux-gnu)
The job was canceled because "i586-unknown-linux-gnu" failed.
|
cross-target testing (s390x-unknown-linux-gnu)
The operation was canceled.
|
cross-target testing (riscv64gc-unknown-linux-gnu)
The job was canceled because "i586-unknown-linux-gnu" failed.
|
cross-target testing (riscv64gc-unknown-linux-gnu)
The operation was canceled.
|
cross-target testing (aarch64-linux-android)
The job was canceled because "i586-unknown-linux-gnu" failed.
|
cross-target testing (aarch64-linux-android)
The operation was canceled.
|
cross-target testing (i686-linux-android)
The job was canceled because "i586-unknown-linux-gnu" failed.
|
cross-target testing (i686-linux-android)
The operation was canceled.
|
cross-target testing (i686-unknown-linux-gnu)
The job was canceled because "i586-unknown-linux-gnu" failed.
|
cross-target testing (i686-unknown-linux-gnu)
The operation was canceled.
|
cross-target testing (armv7-linux-androideabi)
The job was canceled because "i586-unknown-linux-gnu" failed.
|
cross-target testing (armv7-linux-androideabi)
The operation was canceled.
|
cross-target testing (thumbv7neon-linux-androideabi)
The job was canceled because "i586-unknown-linux-gnu" failed.
|
cross-target testing (thumbv7neon-linux-androideabi)
The operation was canceled.
|
Features
Process completed with exit code 101.
|
Build+test (stable, macos-latest)
Process completed with exit code 101.
|
Measure coverage
Process completed with exit code 101.
|
Build+test (stable, windows-latest)
The job was canceled because "stable_macos-latest" failed.
|
Build+test (stable, windows-latest)
The operation was canceled.
|
Build+test (stable, ubuntu-latest)
The job was canceled because "stable_macos-latest" failed.
|
Build+test (stable, ubuntu-latest)
The operation was canceled.
|
Build+test (nightly, ubuntu-latest)
The job was canceled because "stable_macos-latest" failed.
|
Build+test (nightly, ubuntu-latest)
The operation was canceled.
|
Build+test (beta, ubuntu-latest)
The job was canceled because "stable_macos-latest" failed.
|
Build+test (beta, ubuntu-latest)
The operation was canceled.
|
Build+test (stable, macos-latest)
Restore cache failed: Dependencies file is not found in /Users/runner/work/rustls/rustls. Supported file pattern: go.sum
|