rustls #54
build.yml
on: schedule
MSRV
2m 35s
Features
1m 42s
BoGo test suite
2m 18s
Smoke-test fuzzing targets
3m 15s
Run benchmarks
7m 45s
Check for documentation errors
1m 55s
Measure coverage
3m 50s
Check minimum versions of direct dependencies
35s
Check semver compatibility
1m 1s
Format
14s
Format (unstable)
24s
Clippy
2m 39s
Clippy (Nightly)
2m 39s
Validate external types appearing in public API
1m 28s
Run openssl-tests
1m 28s
Matrix: Build+test
Matrix: cross-target testing
Annotations
26 errors and 1 warning
cross-target testing (i586-unknown-linux-gnu)
Process completed with exit code 101.
|
cross-target testing (s390x-unknown-linux-gnu)
The job was canceled because "i586-unknown-linux-gnu" failed.
|
cross-target testing (s390x-unknown-linux-gnu)
The operation was canceled.
|
cross-target testing (riscv64gc-unknown-linux-gnu)
The job was canceled because "i586-unknown-linux-gnu" failed.
|
cross-target testing (riscv64gc-unknown-linux-gnu)
The operation was canceled.
|
cross-target testing (i686-unknown-linux-gnu)
The job was canceled because "i586-unknown-linux-gnu" failed.
|
cross-target testing (i686-unknown-linux-gnu)
The operation was canceled.
|
cross-target testing (aarch64-linux-android)
The job was canceled because "i586-unknown-linux-gnu" failed.
|
cross-target testing (aarch64-linux-android)
The operation was canceled.
|
cross-target testing (armv7-linux-androideabi)
The job was canceled because "i586-unknown-linux-gnu" failed.
|
cross-target testing (armv7-linux-androideabi)
The operation was canceled.
|
cross-target testing (i686-linux-android)
The job was canceled because "i586-unknown-linux-gnu" failed.
|
cross-target testing (i686-linux-android)
The operation was canceled.
|
cross-target testing (thumbv7neon-linux-androideabi)
The job was canceled because "i586-unknown-linux-gnu" failed.
|
cross-target testing (thumbv7neon-linux-androideabi)
The operation was canceled.
|
Features
Process completed with exit code 101.
|
Measure coverage
Process completed with exit code 101.
|
Build+test (stable, macos-latest)
Process completed with exit code 101.
|
Build+test (stable, windows-latest)
The job was canceled because "stable_macos-latest" failed.
|
Build+test (stable, windows-latest)
The operation was canceled.
|
Build+test (nightly, ubuntu-latest)
The job was canceled because "stable_macos-latest" failed.
|
Build+test (nightly, ubuntu-latest)
The operation was canceled.
|
Build+test (stable, ubuntu-latest)
The job was canceled because "stable_macos-latest" failed.
|
Build+test (stable, ubuntu-latest)
The operation was canceled.
|
Build+test (beta, ubuntu-latest)
The job was canceled because "stable_macos-latest" failed.
|
Build+test (beta, ubuntu-latest)
The operation was canceled.
|
Build+test (stable, macos-latest)
Restore cache failed: Dependencies file is not found in /Users/runner/work/rustls/rustls. Supported file pattern: go.sum
|