Skip to content

rustls

rustls #38

Triggered via schedule October 3, 2024 18:01
Status Failure
Total duration 7m 56s
Artifacts

build.yml

on: schedule
MSRV
2m 22s
MSRV
Features
1m 36s
Features
BoGo test suite
2m 16s
BoGo test suite
Smoke-test fuzzing targets
3m 15s
Smoke-test fuzzing targets
Run benchmarks
7m 46s
Run benchmarks
Check for documentation errors
1m 54s
Check for documentation errors
Measure coverage
4m 2s
Measure coverage
Check minimum versions of direct dependencies
32s
Check minimum versions of direct dependencies
Check semver compatibility
51s
Check semver compatibility
Format
7s
Format
Format (unstable)
12s
Format (unstable)
Clippy
2m 39s
Clippy
Clippy (Nightly)
2m 33s
Clippy (Nightly)
Validate external types appearing in public API
1m 24s
Validate external types appearing in public API
Run openssl-tests
1m 23s
Run openssl-tests
Matrix: Build+test
Matrix: cross-target testing
Fit to window
Zoom out
Zoom in

Annotations

26 errors and 1 warning
cross-target testing (i586-unknown-linux-gnu)
Process completed with exit code 101.
cross-target testing (s390x-unknown-linux-gnu)
The job was canceled because "i586-unknown-linux-gnu" failed.
cross-target testing (s390x-unknown-linux-gnu)
The operation was canceled.
cross-target testing (riscv64gc-unknown-linux-gnu)
The job was canceled because "i586-unknown-linux-gnu" failed.
cross-target testing (riscv64gc-unknown-linux-gnu)
The operation was canceled.
cross-target testing (armv7-linux-androideabi)
The job was canceled because "i586-unknown-linux-gnu" failed.
cross-target testing (armv7-linux-androideabi)
The operation was canceled.
cross-target testing (thumbv7neon-linux-androideabi)
The job was canceled because "i586-unknown-linux-gnu" failed.
cross-target testing (thumbv7neon-linux-androideabi)
The operation was canceled.
cross-target testing (aarch64-linux-android)
The job was canceled because "i586-unknown-linux-gnu" failed.
cross-target testing (aarch64-linux-android)
The operation was canceled.
cross-target testing (i686-unknown-linux-gnu)
The job was canceled because "i586-unknown-linux-gnu" failed.
cross-target testing (i686-unknown-linux-gnu)
The operation was canceled.
cross-target testing (i686-linux-android)
The job was canceled because "i586-unknown-linux-gnu" failed.
cross-target testing (i686-linux-android)
The operation was canceled.
Features
Process completed with exit code 101.
Measure coverage
Process completed with exit code 101.
Build+test (nightly, ubuntu-latest)
Process completed with exit code 101.
Build+test (beta, ubuntu-latest)
The job was canceled because "nightly_ubuntu-latest" failed.
Build+test (beta, ubuntu-latest)
Process completed with exit code 101.
Build+test (stable, ubuntu-latest)
The job was canceled because "nightly_ubuntu-latest" failed.
Build+test (stable, ubuntu-latest)
Process completed with exit code 101.
Build+test (stable, windows-latest)
The job was canceled because "nightly_ubuntu-latest" failed.
Build+test (stable, windows-latest)
The operation was canceled.
Build+test (stable, macos-latest)
The job was canceled because "nightly_ubuntu-latest" failed.
Build+test (stable, macos-latest)
The operation was canceled.
Build+test (stable, macos-latest)
Restore cache failed: Dependencies file is not found in /Users/runner/work/rustls/rustls. Supported file pattern: go.sum