Skip to content

Commit

Permalink
update xref
Browse files Browse the repository at this point in the history
  • Loading branch information
mlonsk committed Nov 21, 2024
1 parent 9e2d4dd commit 4b0094e
Showing 1 changed file with 1 addition and 1 deletion.
2 changes: 1 addition & 1 deletion te3/powerbi-xmla-pbix-workaround.md
Original file line number Diff line number Diff line change
Expand Up @@ -47,7 +47,7 @@ This will save the remote model into the Power BI Project that will now contain
If the .pbip folder is configured to store the model as [TMDL](xref:tmdl) files, you will need to use the Save To Folder option in Tabular Editor instead. Then navigate to the Power BI project folder for the semantic model (ModelName.SemanticModel), open the 'definition' folder and save your model there.

> [!NOTE]
> To enable TMDL go to **Tools > Preferences > File Formats > Save-to-folder**, and select "TMDL" in the **Serialization mode** dropdown. See [TMDL documentation for more information](xrefid:tmdl)
> To enable TMDL go to **Tools > Preferences > File Formats > Save-to-folder**, and select "TMDL" in the **Serialization mode** dropdown. See [TMDL documentation for more information](xref:tmdl)
## Step 3.1: Remove incremental refresh partitions and create new (Optional)
Use the Convert Incremental Refresh script below to delete incremental refresh partitions and create a single partition for each table containing the expression used in the incremental refresh expression.
Expand Down

0 comments on commit 4b0094e

Please sign in to comment.