Skip to content

Fix event maturity height #340

Fix event maturity height

Fix event maturity height #340

Triggered via pull request July 12, 2024 21:44
Status Failure
Total duration 48s
Artifacts

main.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

8 errors and 2 warnings
test (ubuntu-latest, 1.22)
2/35 tests failed
Test go.sia.tech/walletd/wallet/TestEventTypes failed in 0.86s: wallet/wallet_test.go#L3593
wallet_test.go:3593: reorg failed: couldn't apply block 205::794ec4c9: block 205::794ec4c9 is invalid: commitment hash mismatch
test (macos-latest, 1.22)
The job was canceled because "ubuntu-latest_1_22" failed.
test (ubuntu-latest, 1.21)
The job was canceled because "ubuntu-latest_1_22" failed.
test (windows-latest, 1.21)
The job was canceled because "ubuntu-latest_1_22" failed.
test (windows-latest, 1.21)
The operation was canceled.
test (macos-latest, 1.21)
The job was canceled because "ubuntu-latest_1_22" failed.
test (windows-latest, 1.22)
The job was canceled because "ubuntu-latest_1_22" failed.
test (ubuntu-latest, 1.21)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
test (macos-latest, 1.21)
Failed to restore: "/opt/homebrew/bin/gtar" failed with error: The process '/opt/homebrew/bin/gtar' failed with exit code 2