document all the commands in CALM #30237
Triggered via pull request
September 26, 2023 12:41
Status
Cancelled
Total duration
2m 11s
Artifacts
–
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
continous-integration.yml
on: pull_request
Check for file changes
6s
Build Docker base images and setup environment
18s
Check for changelog
7s
Matrix: Run Tests
Wait for docs tests
28s
Code Quality
4s
Run Non-Sequential Integration Tests
31s
Run Sequential Integration Tests
28s
Matrix: Run Flaky Tests
Matrix: Build Docker
SonarCloud Scan
0s
Notify Slack & Publish Release Notes
0s
Annotations
20 errors
Run Sequential Integration Tests
Canceling since a higher priority waiting request for 'continous-integration-refs/pull/12871/merge' exists
|
Run Sequential Integration Tests
A task was canceled.
|
Wait for docs tests
Canceling since a higher priority waiting request for 'continous-integration-refs/pull/12871/merge' exists
|
Wait for docs tests
The operation was canceled.
|
Build Docker (spacy-de)
Canceling since a higher priority waiting request for 'continous-integration-refs/pull/12871/merge' exists
|
Build Docker (spacy-de)
The operation was canceled.
|
Build Docker (spacy-it)
Canceling since a higher priority waiting request for 'continous-integration-refs/pull/12871/merge' exists
|
Build Docker (spacy-it)
The operation was canceled.
|
Build Docker (spacy-en)
Canceling since a higher priority waiting request for 'continous-integration-refs/pull/12871/merge' exists
|
Build Docker (spacy-en)
The operation was canceled.
|
Build Docker (default)
Canceling since a higher priority waiting request for 'continous-integration-refs/pull/12871/merge' exists
|
Build Docker (default)
The operation was canceled.
|
Build Docker (mitie-en)
Canceling since a higher priority waiting request for 'continous-integration-refs/pull/12871/merge' exists
|
Build Docker (mitie-en)
The operation was canceled.
|
Run Non-Sequential Integration Tests
Canceling since a higher priority waiting request for 'continous-integration-refs/pull/12871/merge' exists
|
Run Non-Sequential Integration Tests
The operation was canceled.
|
Build Docker (full)
Canceling since a higher priority waiting request for 'continous-integration-refs/pull/12871/merge' exists
|
Build Docker (full)
The operation was canceled.
|
Prepare coverage reports
Canceling since a higher priority waiting request for 'continous-integration-refs/pull/12871/merge' exists
|
Prepare coverage reports
The operation was canceled.
|