Skip to content

Go Live version

Go Live version #94

Triggered via pull request October 10, 2023 15:51
@ml-evsml-evs
synchronize #6
develop
Status Failure
Total duration 1m 14s
Artifacts

testing.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
lint
Process completed with exit code 1.
test (3.8)
Process completed with exit code 1.
test (3.9)
The job was canceled because "_3_8" failed.
test (3.9)
The operation was canceled.
test (3.10)
The job was canceled because "_3_8" failed.
test (3.10)
The operation was canceled.
test (3.11)
The job was canceled because "_3_8" failed.
test (3.11)
The operation was canceled.
docs
Process completed with exit code 127.