Skip to content

Issue #244: controller test added, refactoring #786

Issue #244: controller test added, refactoring

Issue #244: controller test added, refactoring #786

Triggered via push May 6, 2024 12:31
Status Failure
Total duration 2m 10s
Artifacts 3

compile-test.yml

on: push
Compile and Test
2m 1s
Compile and Test
Event File
2s
Event File
Build and Push Docker Image
0s
Build and Push Docker Image
Fit to window
Zoom out
Zoom in

Annotations

1 error, 1 warning, and 2 notices
Compile and Test
Process completed with exit code 1.
testGetStudyTimeline (io.redlink.more.studymanager.controller.studymanager.CalendarControllerTest) failed: io.redlink.more.studymanager.controller.studymanager.CalendarControllerTest#L0
artifacts/Test Results/studymanager/target/surefire-reports/TEST-io.redlink.more.studymanager.controller.studymanager.CalendarControllerTest.xml [took 0s]
1 skipped test found
There is 1 skipped test, see "Raw output" for the name of the skipped test.
89 tests found
There are 89 tests, see "Raw output" for the full list of tests.

Artifacts

Produced during runtime
Name Size
Event File Expired
2.28 KB
Licenses List Expired
5.74 KB
Test Results Expired
236 KB