Skip to content

Commit

Permalink
Update Projects.rst
Browse files Browse the repository at this point in the history
  • Loading branch information
arght committed Oct 16, 2024
1 parent dcd3019 commit 232ed95
Showing 1 changed file with 5 additions and 0 deletions.
5 changes: 5 additions & 0 deletions doc/rst/Projects.rst
Original file line number Diff line number Diff line change
Expand Up @@ -9,6 +9,11 @@ The model has being used in these research projects:

It aims to quantify the value of distributed batteries and demand response in the context of the National Integrated Energy and Climate Plan (PNIEC).

- `Application of the ENTSO-e cost-benefit analysis method to Conso II pumped-hydro storage <https://www.iit.comillas.edu/publicacion/proyecto/en/IberdrolaConsoIIENTSOE/Aplicaci%c3%b3n_de_la_metodolog%c3%ada_ENTSO-E_de_an%c3%a1lisis_de_coste_beneficio_al_proyecto_de_la_CH_Conso_II>`_, developed for **Iberdrola**.
September 2024. `L. Rouco <https://www.iit.comillas.edu/people/rouco>`_, `E. Lobato <https://www.iit.comillas.edu/people/enrique>`_, `A. Ramos <https://www.iit.comillas.edu/people/aramos>`_, `L. Olmos <https://www.iit.comillas.edu/people/olmos>`_

It aims to write a report on the application of the ENTSO-e 2024 cost-benefit analysis method to Conso II pumped-hydro storage.

- `Application of the ENTSO-e cost-benefit analysis method to Aguayo II pumped-hydro storage 2024 <https://www.iit.comillas.edu/publicacion/proyecto/en/Repsol_AguayoII_2024/Aplicaci%c3%b3n_de_la_metodolog%c3%ada_ENTSO-E_de_an%c3%a1lisis_de_coste_beneficio_al_proyecto_de_la_CH_Aguayo_II_2024>`_, developed for **Repsol**.
June 2024 - September 2024. `A. Ramos <https://www.iit.comillas.edu/people/aramos>`_, `L. Olmos <https://www.iit.comillas.edu/people/olmos>`_, `L. Rouco <https://www.iit.comillas.edu/people/rouco>`_, `E. Lobato <https://www.iit.comillas.edu/people/enrique>`_

Expand Down

0 comments on commit 232ed95

Please sign in to comment.