Skip to content

Bump actions/checkout from 3 to 4 #3

Bump actions/checkout from 3 to 4

Bump actions/checkout from 3 to 4 #3

Triggered via pull request September 21, 2023 20:00
Status Failure
Total duration 30s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

run-tests.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

18 errors
P8.2 - L10.* - prefer-lowest - ubuntu-latest
"./composer.json" does not match the expected JSON schema: - name : Does not match the regex pattern ^[a-z0-9]([_.-]?[a-z0-9]+)*/[a-z0-9](([_.]|-{1,2})?[a-z0-9]+)*$
P8.2 - L10.* - prefer-lowest - ubuntu-latest
Process completed with exit code 1.
P8.2 - L10.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_10___pr" failed.
P8.2 - L10.* - prefer-stable - ubuntu-latest
"./composer.json" does not match the expected JSON schema: - name : Does not match the regex pattern ^[a-z0-9]([_.-]?[a-z0-9]+)*/[a-z0-9](([_.]|-{1,2})?[a-z0-9]+)*$
P8.2 - L10.* - prefer-stable - ubuntu-latest
Process completed with exit code 1.
P8.1 - L10.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_10___pr" failed.
P8.1 - L10.* - prefer-lowest - ubuntu-latest
"./composer.json" does not match the expected JSON schema: - name : Does not match the regex pattern ^[a-z0-9]([_.-]?[a-z0-9]+)*/[a-z0-9](([_.]|-{1,2})?[a-z0-9]+)*$
P8.1 - L10.* - prefer-lowest - ubuntu-latest
Process completed with exit code 1.
P8.2 - L10.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_2_10___pr" failed.
P8.2 - L10.* - prefer-stable - windows-latest
The operation was canceled.
P8.1 - L10.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_2_10___pr" failed.
P8.1 - L10.* - prefer-lowest - windows-latest
The operation was canceled.
P8.2 - L10.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_2_10___pr" failed.
P8.2 - L10.* - prefer-lowest - windows-latest
The operation was canceled.
P8.1 - L10.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_10___pr" failed.
P8.1 - L10.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.1 - L10.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_2_10___pr" failed.
P8.1 - L10.* - prefer-stable - windows-latest
The operation was canceled.