Update configure_multi_stage_inputs.jl (#666)
Browse files Browse the repository at this point in the history
Add check on capital recovery period with non-zero investment cost
  • Loading branch information
sambuddhac authored and lbonaldo committed Apr 16, 2024
1 parent 210e1c9 commit 90e1936
Show file tree
Hide file tree
Showing 2 changed files with 29 additions and 14 deletions.
2 changes: 2 additions & 0 deletions CHANGELOG.md
Original file line number Diff line number Diff line change
Expand Up @@ -8,6 +8,8 @@ and this project adheres to [Semantic Versioning](https://semver.org/spec/v2.0.0
## Unreleased

### Fixed
- Add check when capital recovery period is zero and investment costs are
non-zero in multi-stage GenX (#666)
- Fix write_status with UCommit = WriteShadowPrices = 1 (#645)

## [0.3.7] - 2024-04-02
Expand Down
41 changes: 27 additions & 14 deletions src/multi_stage/configure_multi_stage_inputs.jl
Original file line number Diff line number Diff line change
Expand Up @@ -21,26 +21,39 @@ NOTE: The inv\_costs\_yr and crp arrays must be the same length; values with the
returns: array object containing overnight capital costs, the discounted sum of annual investment costs incured within the model horizon.
"""
function compute_overnight_capital_cost(settings_d::Dict,inv_costs_yr::Array,crp::Array, tech_wacc::Array)
function compute_overnight_capital_cost(settings_d::Dict,
inv_costs_yr::Array,
crp::Array,
tech_wacc::Array)

# Check for resources with non-zero investment costs and a Capital_Recovery_Period value of 0 years
if any((crp .== 0) .& (inv_costs_yr .> 0))
msg = "You have some resources with non-zero investment costs and a Capital_Recovery_Period value of 0 years.\n" *
"These resources will have a calculated overnight capital cost of \$0. Correct your inputs if this is a mistake.\n"
error(msg)
end

cur_stage = settings_d["CurStage"] # Current model
num_stages = settings_d["NumStages"] # Total number of model stages
stage_lens = settings_d["StageLengths"]
cur_stage = settings_d["CurStage"] # Current model
num_stages = settings_d["NumStages"] # Total number of model stages
stage_lens = settings_d["StageLengths"]

# 1) For each resource, find the minimum of the capital recovery period and the end of the model horizon
# Total time between the end of the final model stage and the start of the current stage
model_yrs_remaining = sum(stage_lens[cur_stage:end])
# 1) For each resource, find the minimum of the capital recovery period and the end of the model horizon
# Total time between the end of the final model stage and the start of the current stage
model_yrs_remaining = sum(stage_lens[cur_stage:end]; init = 0)

# We will sum annualized costs through the full capital recovery period or the end of planning horizon, whichever comes first
payment_yrs_remaining = min.(crp, model_yrs_remaining)

# KEY ASSUMPTION: Investment costs after the planning horizon are fully recoverable, so we don't need to include these costs
# 2) Compute the present value of investment associated with capital recovery period within the model horizon - discounting to year 1 and not year 0
# (Factor to adjust discounting to year 0 for capital cost is included in the discounting coefficient applied to all terms in the objective function value.)
occ = zeros(length(inv_costs_yr))
for i in 1:length(occ)
occ[i] = sum(inv_costs_yr[i]/(1+tech_wacc[i]) .^ (p) for p=1:payment_yrs_remaining[i])
end
# KEY ASSUMPTION: Investment costs after the planning horizon are fully recoverable, so we don't need to include these costs
# 2) Compute the present value of investment associated with capital recovery period within the model horizon - discounting to year 1 and not year 0
# (Factor to adjust discounting to year 0 for capital cost is included in the discounting coefficient applied to all terms in the objective function value.)
occ = zeros(length(inv_costs_yr))
for i in 1:length(occ)
occ[i] = sum(
inv_costs_yr[i] / (1 + tech_wacc[i]) .^ (p)
for p in 1:payment_yrs_remaining[i];
init = 0)
end

# 3) Return the overnight capital cost (discounted sum of annual investment costs incured within the model horizon)
return occ
Expand Down

0 comments on commit 90e1936