Docs: Consistent whitespace in developers guide #8113
ci.yaml
on: pull_request
Pre-build checks
7m 7s
Matrix: compile
Run fuzz regression tests
8m 50s
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
CI completion
0s
Annotations
16 errors
Test CLN dual-fund
Process completed with exit code 1.
|
Test CLN gcc
The job was canceled because "dual-fund_compile-gcc_sql" failed.
|
Test CLN gcc
The operation was canceled.
|
Test CLN clang
The job was canceled because "dual-fund_compile-gcc_sql" failed.
|
Test CLN clang
The operation was canceled.
|
Test CLN liquid
The job was canceled because "dual-fund_compile-gcc_sql" failed.
|
Test CLN liquid
The operation was canceled.
|
Test CLN postgres
The job was canceled because "dual-fund_compile-gcc_sql" failed.
|
Test CLN postgres
The operation was canceled.
|
Test CLN splicing
The job was canceled because "dual-fund_compile-gcc_sql" failed.
|
Test CLN splicing
The operation was canceled.
|
Sanitizers Test CLN (ASan/UBSan (03/10), --test-group=3 --test-group-count=10)
Process completed with exit code 1.
|
Sanitizers Test CLN (ASan/UBSan (02/10), --test-group=2 --test-group-count=10 -n 1)
The job was canceled because "ASan_UBSan__03_10__--test" failed.
|
Sanitizers Test CLN (ASan/UBSan (02/10), --test-group=2 --test-group-count=10 -n 1)
The operation was canceled.
|
Sanitizers Test CLN (ASan/UBSan (05/10), --test-group=5 --test-group-count=10)
The job was canceled because "ASan_UBSan__03_10__--test" failed.
|
Sanitizers Test CLN (ASan/UBSan (05/10), --test-group=5 --test-group-count=10)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
cln-compile-clang-sanitizers.tar.bz2
Expired
|
164 MB |
|
cln-compile-clang.tar.bz2
Expired
|
110 MB |
|
cln-compile-gcc-O3.tar.bz2
Expired
|
140 MB |
|
cln-compile-gcc.tar.bz2
Expired
|
111 MB |
|